Home Artists Posts Import Register

Content

We've finished the risers today.  They had video floors in them last year, but just two independent sections of RGB lighting in them this year.  One will have an illuminated transparent drum kit on it, but I'm not sure if it's going to be just a single RGB channel or if each drum will be independently controlled over the wireless network.

There's a slight issue with the set builder making the top LED channel too deep, which means that we may have to strip it out and pack it up higher.  But the main wiring and control system is done, so that would be fairly easy to do.

The pneumatic system is new.  The risers (podiums/mobile-stages) have an air receiver in them which can be pressurised to allow the wheels to be dropped and retracted easily while moving into position.

https://www.youtube.com/watch?v=zvdOOJv59UU

Files

29 July 2023