Home Artists Posts Import Register

Content

i don't know how many of these have been made so far.

buT ANYWAY:

  •  the leaky pipe has been replaced  
  • kitchen is still torn up
  • we now however have a temporary sink, so that's good
  • the two (three) steps remaining are for the wall to be rebuilt, and the cabinets / appliances to be reinstalled (and probably resurface the countertops). This is probably gonna be the longest part of the job.

Anyway though, things are at least normal enough now where I can work on extra things again. If you're in an appropriate tier and were waiting to ask about a commission, feel free to shoot me a message! As a reminder, rates are viewable from here. I've also included a new calculator sheet with preset options that people may use to figure out what the prices should come to! (You'll need to make a copy of the sheet to use the calculator.)