Home Artists Posts Import Register

Content

Very early in the design stage.  Estimated 18,000 tongs.  Keel laid in  2020.

Files

Comments

Anonymous

A very important new piece of information there. Thank you captain. However, captain I do notice a few things interesting in the picture. The Chinese in the picture reads "HaiLong"(Sea Dragon) class SSBN "Shenzhen". Which is not likely to be accurate because of two reasons. First PLAN nuclear submarines are usually named after "ChangZheng"(Long March), like "ChangZheng-1" was the first Han-class SSN. Second the name "ShenZhen" is already taken by PLAN DD-167, the sole Type 051B Luhai class, originally entered service around year 2000, and has recently been refitted and recommissioned in 2016. What I was trying to say is that the information on the new submarine is very likely to be true, but the picture may not be the most accurate.

subbrief

Thank you for the translation. This drawing is so early in the design that I am sure a lot of things will change, including the name before it's finished.

Anonymous

looks a lot like the sub from voyage to the bottom of the sea